Installation of Medical Waste Pyrolysis Equipment in Philippines

October 29, 2025

By the end of October 2025, Mingjie Group had completed the installation of MJ-15 medical waste pyrolysis equipment in Philippines. The pyrolysis plant operates at high temperatures in an oxygen-free environment. It enables the reduction, harmlessness, and energy recovery of medical waste.

The success of a medical waste pyrolysis plant depends on the technology itself, but even more so on a professional and safe installation process for the equipment.

Henan Mingjie Environmental Equipment Co., Ltd

Core Installation Process of Pyrolysis Equipment in Philippines

Site Hardening and Corrosion Protection: Equipment foundations must be constructed of poured concrete. An epoxy resin anti-corrosion layer is applied to the surface (to prevent corrosion from medical waste leachate).

Equipment Placement: Heavy equipment such as the pyrolysis furnace and flue gas purification tower are precisely positioned using a crane.

Pyrolysis Reactor: This is the core of the pyrolysis equipment installation. Ensure precise levelness and verticality, good sealing at all flange connections, and complete application of the fire-resistant insulation layer.

Henan Mingjie Environmental Equipment Co., Ltd 

Pipelining and Electrical Installation: Flue gas pipes use flange connections, and sealing gaskets prevent flue gas leakage. The electrical system requires a separate grounding network to prevent hazards caused by electrical sparks.

Feeding and Discharge System: The feed inlet must be equipped with double seals to prevent the leakage of toxic gases during operation. The discharge end is equipped with a water-cooled spiral slag discharge system to achieve residue cooling and sealed conveying.

Flue Gas Treatment System: This is crucial for achieving environmental standards. The condensation system, cooling tower, dust collector, scrubbing tower, and other units must be connected strictly according to the sequence and specifications to ensure airtightness.

Electrical and Automation System Integration: Dust and moisture protection measures must be taken during PLC control system installation. Complete signal connection and initial debugging of all sensors and actuators.

Henan Mingjie Environmental Equipment Co., Ltd

 

The installation of medical waste pyrolysis equipment in Philippines must strictly adhere to compliance requirements, while also strengthening personnel training and risk control. Only by standardizing the installation process and refining safety management can the long-term stable operation of the equipment be ensured. This not only meets the needs of harmless disposal of medical waste but also complies with environmental protection and public health standards.

 

 